YHauz.co USA Book a slotBook · $100

YHauz System

High-tech housing and office system. You bolt it together.

Hauz of Innovations. Patent pending.

Rendering of a YHauz: a black steel frame standing on its own columns, tan insulated panels trimmed with brown composite moldings, a band of windows along one wall and a band of glass doors along the other, with a furnished interior.
  • Black: the steel frame
  • Tan: insulated metal panels
  • Brown: composite moldings
  • Glass: window and door bands

Rendering of the 650 sq ft Starter, shown with the permeable composite floor (Tier 2), optional doors and windows, and furniture.

Six steps. Everything bolts. No wood, no cement, no welding on site.

  1. Dig the holes

    One hole for each column, up to about 40 in (1 m) deep, depending on the slope. Nothing else is dug. The lower end of the column goes into the ground and carries the building, the way a post does. No slab. Nothing poured.

  2. Bolt the frame

    Each steel tube has tabs that fit into slots. Flat steel gusset plates fit into slots in the tubes and tie two or more tubes together at a joint. Seat the parts, put in the bolts, tighten. Each part fits one place only. Nothing to measure, cut or drill.

  3. Stand the walls

    Stand the insulated panels in the frame. Bolt the clamp rails over their edges; the threads are already in the steel. Cover the rails with the composite moldings.

  4. Fit windows and doors

    The frame leaves open bands for them, level or upright. Windows and doors go into the bands. You never cut a panel.

  5. Close the roof

    Lay the insulated roof panels and fasten them down. Rivet the flashing along the edges to keep the rain out.

  6. Bolt down the floor

    Composite boards bolt to the steel floor frame with a small gap between them. The floor drains at every point, so a kitchen or a bath can go anywhere, now or later.

Why it all fits

Our software draws every tube and plate and makes each slot a hair bigger than the part that goes into it. Those files go to the factory and run the laser, which cuts every part with its tabs, slots and holes. Some holes come with the thread already cut. The same files make one kit or many, and every part still fits.

The parts

  • Steel frame tubes and gusset plates, cut and labeled
  • Insulated metal panels for walls and roof
  • Clamp rails and stainless bolts
  • Flashing and composite moldings
  • Composite floor boards (Tier 2)

What you need

Common hand tools and a few helpers. No welder. No concrete truck. It comes apart the way it went together, so you can change it or move it later.

One size, three readiness tiers.

YHauz Starter: 650 sq ft, square plan. Each tier includes the one before it.

Tier 1: KitFrame, walls, roof, fasteners. You assemble it with your own people.From $65,000 FOB Oakland, CA
Tier 2: AssembledTier 1, plus the permeable composite floor, interior partitions, and assembly on your site by our team.Quoted with your plan
Tier 3: Turn-keyTier 2, finished as a two-bedroom, one-bath unit, under your county’s zoning and ADU rules.Quoted with your plan
Deck and loftOptional. The deck uses the same composite boards. The loft is for storage or sleeping.Quoted with your plan

The $100 fee books your production slot. You receive a PDF plan and a certificate of the booking by email. The fee is non-refundable and is not credited to the price of your tier. It is not an order: the price of your tier is set with your plan and confirmed in your written quote.

The first Hauz stands in Waialua, Hawaiʻi; the background of this page is drawn from a photo of it. Visit by appointment, or walk through it on a video call.